[jira] [Assigned] (CARBONDATA-1755) Carbon1.3.0 Concurrent Insert overwrite-update: User is able to run insert overwrite and update job concurrently.

classic Classic list List threaded Threaded
1 message Options
Reply | Threaded
Open this post in threaded view
|

[jira] [Assigned] (CARBONDATA-1755) Carbon1.3.0 Concurrent Insert overwrite-update: User is able to run insert overwrite and update job concurrently.

Akash R Nilugal (Jira)

     [ https://issues.apache.org/jira/browse/CARBONDATA-1755?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]

Jatin reassigned CARBONDATA-1755:
---------------------------------

    Assignee: Jatin

> Carbon1.3.0 Concurrent Insert overwrite-update: User is able to run insert overwrite and update job concurrently.
> -----------------------------------------------------------------------------------------------------------------
>
>                 Key: CARBONDATA-1755
>                 URL: https://issues.apache.org/jira/browse/CARBONDATA-1755
>             Project: CarbonData
>          Issue Type: Bug
>          Components: data-load
>    Affects Versions: 1.3.0
>         Environment: 3 Node ant cluster
>            Reporter: Ajeet Rai
>            Assignee: Jatin
>            Priority: Minor
>              Labels: dfx
>
> Carbon1.3.0 Concurrent Insert overwrite-update: User is able to run insert overwrite and update job concurrently.
> updated data will be overwritten by insert overwrite job. So there is no meaning of running update job if insert overwrite is in progress.
> Steps:
> 1: Create a table
> 2: Do a data load
> 3: run insert overwrite job.
> 4: run a update job while overwrite job is still running.
> 5: Observe that update job is finished and after that overwrite job is also finished.
> 6: All previous segments are marked for delete and there is no impact of update job. Update job will use the resources unnecessary.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)